What determines the project price
Seven factors, ordered by their usual weight. Anyone who can answer these for their own system already has half of the detail analysis in their head.
Which NAV version you are coming from
Weight: High Moving from NAV 2018 to Business Central is a different project from moving off Navision 2009 or something older. The wider the version gap, the more intermediate steps in the data migration and the more customisations that can no longer be carried over one to one.
How heavily customised your system is
Weight: Very high Usually the largest single item. Every C/AL customisation has to be assessed: carry it over as an AL extension, replace it with standard functionality, or drop it. An installation running close to standard is considerably cheaper than a special-purpose solution grown over fifteen years.
Number and type of interfaces
Weight: Medium to high Every connection to a shop, DMS, payroll, time tracking, shipping or production system has to be rebuilt and retested. Modern API connections are quick; file-based interfaces and legacy direct database access cost more.
Scope of the data migration
Weight: Medium Master data and open items move in practically every project. The question is history: how many years of documents should come across, and in what depth? That is a decision with a direct cost effect, and it can be made deliberately.
Reports and analytics
Weight: Medium Custom report layouts in NAV have often grown over years. They have to be rebuilt — frequently the point at which moving to Power BI pays off, rather than recreating old layouts one to one.
Cloud or staying on premises
Weight: Medium Business Central Online removes server operation, update effort and infrastructure cost, but requires every customisation to be cloud-ready. On-premises operation allows more special cases, but hosting and updates stay with you.
Training and go-live support
Weight: Low to medium Business Central does not look like Navision. The effort depends on the number of users and on how many processes change along with the upgrade. Planned too tightly, it comes back as support load after go-live.
How far is the road from your version? See the upgrade guide by NAV version →